OUR EXPERTISE

Risk analysis

Whether it is a project or an existing installation, our support covers all industrial risks, to anticipate, control and protect your teams, your installations and the environment.

Risk analysis

Our services

Icône POI – Plan d’opération interne

POI – Internal operation plan

Icône AMDEC – Analyse des modes de défaillance

FMEA – Failure modes and effects analysis

Icône HAZOP – Analyse des risques et opérabilité

HAZOP – Hazard and operability analysis

Icône ATEX – Risques d’explosion

ATEX – Explosion risks

Our solutions

Personalized Support

Contact NUMTECH – échange avec un expert risques

We put our experience, rigor, and expertise to work for your projects, helping you achieve the required risk management performance, whether for internal needs or regulatory requirements (ICPE, Labor Code, etc.). Our team is available to assist you in identifying the expertise best suited to your project. You'll receive tailored support from the very first meeting.

  • Meet with an expert
  • Tailored approach

Quick links

Discover our related expertise

Lien vers nos services Qualité de l’air
Our services

Air quality

Learn more
Lien vers Performance environnementale
Our services

Environmental performance

Learn more

They trust us:

F. A. Q

Do you have any questions?

FAQ analyse de risques industriels
FMEA (AMDEC): identifies potential failures of an equipment or component, their effects and criticality, to prevent incidents and optimize reliability.
HAZOP: analyses deviations from process operating parameters to detect risk scenarios and strengthen safety.
ATEX: assesses and controls explosion risks related to flammable gases, vapours or dusts by defining hazardous zones and prevention measures.
- Yes, if your site is classified SEVESO upper- or lower-tier.
- The POI anticipates the actions to be taken in the event of a crisis (fire, explosion, toxic pollution) and coordinates human and material resources to limit the consequences of the incident.
POI: an internal plan, drawn up and implemented by the operator, focused on incidents that can be managed within the site.
PPI: triggered by the authorities when an incident has off-site consequences, involving public emergency services.
No. They also bring:
- Greater safety for personnel and facilities.
- Lower costs from incidents or unplanned shutdowns.
- Better quality and process performance.
- Increased reliability of industrial operations.

Customer area






Unknown credentials.

Forgot your password?